Scheduling and control of one of a king production

dc.contributor.advisorTu, Yiliu (Paul)
dc.contributor.advisorXue, Deyi
dc.contributor.authorYu, Liang
dc.date.accessioned2017-12-18T21:43:07Z
dc.date.available2017-12-18T21:43:07Z
dc.date.issued2008
dc.descriptionBibliography: p. 118-125en
dc.format.extentxii, 125 leaves : ill. ; 30 cm.en
dc.identifier.citationYu, L. (2008). Scheduling and control of one of a king production (Master's thesis, University of Calgary, Calgary, Canada). Retrieved from https://prism.ucalgary.ca. doi:10.11575/PRISM/2217en_US
dc.identifier.doihttp://dx.doi.org/10.11575/PRISM/2217
dc.identifier.urihttp://hdl.handle.net/1880/103218
dc.language.isoeng
dc.publisher.institutionUniversity of Calgaryen
dc.publisher.placeCalgaryen
dc.rightsUniversity of Calgary graduate students retain copyright ownership and moral rights for their thesis. You may use this material in any way that is permitted by the Copyright Act or through licensing that has been assigned to the document. For uses that are not allowable under copyright legislation or licensing, you are required to seek permission.
dc.titleScheduling and control of one of a king production
dc.typemaster thesis
thesis.degree.disciplineMechanical and Manufacturing Engineering
thesis.degree.grantorUniversity of Calgary
thesis.degree.nameMaster of Science (MSc)
ucalgary.thesis.accessionTheses Collection 58.002:Box 1837 520492285
ucalgary.thesis.notesUARCen
ucalgary.thesis.uarcreleaseyen
Files
Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
ucalgary_2008_yu_liang_492688.pdf
Size:
11.05 MB
Format:
Adobe Portable Document Format
Description:
Thesis
Collections